# The Trafford Park Railway Order 1995, Paragraph 7


There shall be a secondary control point on each rail departure side of the Village Circle so located that the head of or the locomotive of a train approximately 200 metres long can be stopped adjacent to it and clear of the nearest crossing in rear of the train. Each of the secondary control points shall have a key operated main switch to energise the control point and a switch to release the special phase of the road traffic light signal controller — a “cancel switch”.

---
Source: https://www.legislation.gov.uk/uksi/1995/2446/schedule/2/paragraph/7 (the official version)
Page: https://openlegislation.uk/trafford-park-railway-order-1995/schedule-2/paragraph-7
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

