# The Transport for Greater Manchester (Light Rapid Transit System) (Oldham, Manchester Street Modification) Order 2012, Schedule: Scheduled Work


In the Borough of Oldham—
A tramroad approximately 250 metres in length (double line) commencing at a point with a grid reference (391967,404833) approximately 110 metres west of the termination of Work No.1 of the 1994 Act, running from that point in an easterly direction across the Manchester Street roundabout before terminating at a point with a grid reference (392220,404781) 45 metres to the west of the termination of Work No.2 of the 1994 Act near the eastern side of John Street opposite its junction with Foundry Street.

---