{
  "url": "https://openlegislation.uk/transport-for-greater-manchester-light-rapid-transit-system-oldham-mumps-modification-order-2012/article-7",
  "json_url": "https://openlegislation.uk/transport-for-greater-manchester-light-rapid-transit-system-oldham-mumps-modification-order-2012/article-7.json",
  "legislation": "uksi/2012/981",
  "legislation_title": "The Transport for Greater Manchester (Light Rapid Transit System) (Oldham, Mumps Modification) Order 2012",
  "legislation_url": "https://openlegislation.uk/transport-for-greater-manchester-light-rapid-transit-system-oldham-mumps-modification-order-2012",
  "path": "article/7",
  "kind": "article",
  "number": "7",
  "heading": "Variation of Mumps Surface Crossing limits",
  "text": "(1) The undertaker may, in constructing and maintaining Work No.1 authorised by the Mumps Surface Crossing Order, deviate laterally from the lines or situations shown on the works plans for that Order within the limits of deviation for that work shown on those plans and also within the additional limits of deviation.\n(2) Article 3(2) of the Mumps Surface Crossing Order is amended by the insertion after the words “Subject to article 4 below” of the words “and article 7(1) of the Transport for Greater Manchester (Light Rapid Transit System) (Oldham, Mumps Modification) Order 2012”.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "footnote",
      "label": "f1",
      "text": "S.I.2012/981."
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2012/981/article/7",
    "retrieved_at": "2026-10-29T01:35:01.172131+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}