# The Transport for Greater Manchester (Light Rapid Transit System) (Oldham, Mumps Modification) Order 2012, Schedule: Scheduled Work


In the borough of Oldham
A tramroad (double track) approximately 130 metres in length constructed by the undertaker, by way of a deviation of the Middleton to Shaw railway, from a point north east of the former Mumps station running across the road intersection between Oldham Way, Lees Road and Mumps before terminating in the vicinity of Wallshaw Place by a junction with the commencement of Work No.2 of the Mumps Surface Crossing Order.

---
Source: https://www.legislation.gov.uk/uksi/2012/981/schedule (the official version)
Page: https://openlegislation.uk/transport-for-greater-manchester-light-rapid-transit-system-oldham-mumps-modification-order-2012/schedule
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

