# The Transport for Greater Manchester (Light Rapid Transit System) (Second City Crossing) Order 2013, Schedule 1: SCHEDULED WORKS

Extent: E+W

(1)
Number of Work
(2)
Description of Work
Work No. 1
A tramroad / tramway 317 metres in length (multiple line), commencing at the junction of Lower Mosley Street / Windmill Street and running northeast along Lower Mosley Street, crossing Peter Street to run through St Peter’s Square. The work continues in a northeasterly direction terminating at the rear of the footway flanking Princess Street.
Work No. 2
A tramway 577 metres in length (double line), commencing at the termination of Work No. 1 running northwest within the carriageway of Princess Street before turning into Cross Street to run in a northeasterly direction within the carriageway of Cross Street and Corporation Street, terminating 16 metres north of the junction of Corporation Street and Market Street.
Work No. 3
A tramway 392 metres in length (double line), commencing at the termination of Work No. 2 and running northeast within the carriageway of Corporation Street, leaving the highway at the Corporation Street / Balloon Street junction to join the existing Metrolink lines and terminating at the rear of the footway flanking Corporation Street.

---
Source: https://www.legislation.gov.uk/uksi/2013/2587/schedule/1 (the official version)
Page: https://openlegislation.uk/transport-for-greater-manchester-light-rapid-transit-system-second-city-crossing-order-2013/schedule-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.