# The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order 2016, Part 2: FOOTPATHS AND BRIDLEWAYS TO BE TEMPORARILY STOPPED UP


TS: Temporary stopping up of street
(1)
Street affected
(2)
Extent of stopping up
In the Metropolitan Borough of Trafford
Path flanking the northern bank of Bridgewater Canal
Between TS01 and TS02
Path flanking the southern bank of Manchester Ship Canal
Between TS03 and TS04
Path linking Trafford Wharf Road to the path flanking the southern bank of Manchester Ship Canal
Between TS05 and TS06
Path linking Trafford Wharf Road to the path flanking the southern bank of Manchester Ship Canal
Between TS07 and TS08
Path flanking the south-west bank of Bridgewater Canal
Between TS09 and TS10

---
Source: https://www.legislation.gov.uk/uksi/2016/1035/schedule/4/part/2 (the official version)
Page: https://openlegislation.uk/transport-for-greater-manchester-light-rapid-transit-system-trafford-park-extension-order-2016/schedule-4/part-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

