For the purposes of paragraph 30—
(a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus except in a case where the apparatus as so extended serves a purpose (either additional to or instead of that served by the existing apparatus) which was not served by the existing apparatus; and
(b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.

---
Source: https://www.legislation.gov.uk/uksi/2016/1035/schedule/8/paragraph/31 (the official version)
Page: https://openlegislation.uk/transport-for-greater-manchester-light-rapid-transit-system-trafford-park-extension-order-2016/schedule-8/paragraph-31
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.