# The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order 2016, Paragraph 11


(1) The undertaker must, upon completion of any part of a specified work and after the purpose of any temporary works has been accomplished, remove as soon as practicable any temporary works constructed and materials for temporary works placed in, on or over the Canal in connection with that part of the specified work.
(2) All temporary works must be removed to the reasonable satisfaction of the engineer and in such a way as causes as little detriment or interference as reasonably practicable with, or delay or interruption to, the safe passage of vessels along the Canal.
(3) In the event of any detriment to the Canal or interference with, or delay or interruption to, any vessels on the Canal that is caused by the undertaker’s failure to remove any such temporary works, the undertaker must immediately make good such damage and pay to the authority the costs and expenses to which it may be put and the compensation for any loss which it may suffer by reason of such detriment, interference, delay or interruption.
(4) In the event of the undertaker failing to remove the temporary works within a reasonable period after receiving notice from the authority, the authority may remove those works and charge the undertaker with the reasonable costs and expenses reasonably incurred as a result.

---
Source: https://www.legislation.gov.uk/uksi/2016/1035/schedule/9/paragraph/11 (the official version)
Page: https://openlegislation.uk/transport-for-greater-manchester-light-rapid-transit-system-trafford-park-extension-order-2016/schedule-9/paragraph-11
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.