Paragraph 9
(1)
The undertaker must at all reasonable times on being given reasonable notice (except in cases of emergency) allow reasonable facilities to the engineer for access to inspect any specified work during its construction.
(2)
The undertaker must supply the engineer with all such information as the engineer may reasonably require with regard to any specified work or the method of constructing it.
(3)
Any work involving the use of oxy-fuelled gas cutting equipment or equipment of a similar nature may only be carried out within 30 metres of the Canal with the consent of the harbour master (such consent not to be unreasonably withheld or delayed) and in accordance with the reasonable requirements of the harbour master.