# The Triton Knoll Offshore Wind Farm Order 2013, Paragraph 20: Aggregates dredging

Extent: E+W+S

(1) No part of the authorised development shall commence south of a line shown on the Works plan proceeding from point 1 to point 4 in sequence and lying 1,000 metres from the boundary of the active dredging area within the Humber Region Licensed Marine Aggregates Dredging Area 440 unless the Secretary of State has first approved a scheme of mitigation of impacts on aggregates dredging activity. Points 1 to 4 are specified below—
Point
Latitude (DMS)
Longitude (DMS)
Point
Latitude (DMS)
Longitude (DMS)
1
53° 25′ 14.64″ N
0° 53′ 51.36″ E
2
53° 25′ 3.42″ N
0° 54′ 33.96″ E
3
53° 25′ 2.46″ N
0° 56′ 41.88″ E
4
53° 24′ 31.26″ N
0° 58′ 33.9″ E
(2) The scheme of mitigation referred to in this requirement shall be implemented as approved.
(3) In this requirement—
“scheme of mitigation” means measures to maintain a construction restriction zone of 500 metres from the nearest wind farm structure where no aggregate dredging activity or aggregate dredging vessel manoeuvring will take place; and operational restriction zones extending 500 metres from the nearest wind farm structure where dredging vessel manoeuvring must not take place or extending 1,000 metres from the nearest wind farm structure where aggregate dredging activity may take place at some or all tidal states dependent on the aggregate dredging vessel hopper capacity;
“Wind farm structure” means any wind turbine generator, high-voltage, direct current... collector substation, ... ... or cabling or other works comprised in the authorised development.

---
Source: https://www.legislation.gov.uk/uksi/2013/1734/schedule/1/paragraph/20 (the official version)
Page: https://openlegislation.uk/triton-knoll-offshore-wind-farm-order-2013/schedule-1/paragraph-20
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.