  "url": "https://openlegislation.uk/triton-knoll-offshore-wind-farm-order-2013/schedule-1/paragraph-7",
  "json_url": "https://openlegislation.uk/triton-knoll-offshore-wind-farm-order-2013/schedule-1/paragraph-7.json",
  "legislation": "uksi/2013/1734",
  "legislation_title": "The Triton Knoll Offshore Wind Farm Order 2013",
  "legislation_url": "https://openlegislation.uk/triton-knoll-offshore-wind-farm-order-2013",
  "path": "schedule/1/paragraph/7",
  "kind": "paragraph",
  "number": "7",
  "heading": "Further offshore design requirements",
  "text": "(1) No monopile foundation forming part of the authorised development shall—\n(a) in the case of a steel monopile foundation have a diameter of more than ... 8.5 metres; and\n(b) in the case of a concrete monopile foundation have a diameter of more than ... 10.5 metres.\n(2) No gravity base foundation forming part of the authorised development shall have—\n(a) ... a diameter at the level of the seabed of more than 45 metres;\n(b) a base height, where there is a flat base, of more than 7 metres above the level of the seabed;\n(c) a cone/column intersect which is higher than 32 metres above the top of the base;\n(d) a cone diameter of more than 45 metres at its base;\n(e) a column diameter, where there is a flat or conical base, of more than 10 metres.\n(3) No jacket foundation forming part of the authorised development shall have—\n(a) for use with wind turbine generators a width spacing between each leg at the level of the seabed of more than 30 metres and more than 4 legs;\n(b) a pile diameter of more than 3 metres;\n(c) more than one pile per leg or more than one suction can per leg;\n(d) for use with collector substations more than 8 legs;\n(e) a suction can which is more than 14 metres in diameter.\n(4) No suction bucket monopod foundation forming part of the authorised development shall have—\n(a) a diameter at the level of the seabed of more than 25 metres;\n(b) a column diameter of more than 10.5 metres.\n(5) No tripod foundation forming part of the authorised development shall have—\n(a) more than three legs;\n(b) a brace diameter of more than 5.5 metres;\n(c) a pile diameter of more than 3 metres;\n(d) more than one pile per leg;\n(e) a column diameter of more than 8 metres;\n(f) a suction can which is more than 14 metres in diameter.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 1 para. 7(1)(a) omitted (6.8.2018) by virtue of The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 6(5)"
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Words in Sch. 1 para. 7(1)(b) omitted (6.8.2018) by virtue of The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 6(6)"
    },
    {
      "type": "F",
      "label": "F3",
      "text": "Words in Sch. 1 para. 7(2)(a) omitted (6.8.2018) by virtue of The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 6(7)"
    },
    {
      "type": "F",
      "label": "F4",
      "text": "Sch. 1 para. 7(3)(d) substituted (6.8.2018) by The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 6(8)"
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 1 Pt. 3 para. 7 in force at 12.7.2013, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2013/1734/schedule/1/paragraph/7",
    "retrieved_at": "2026-10-29T00:48:05.771191+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}