  "url": "https://openlegislation.uk/triton-knoll-offshore-wind-farm-order-2013/schedule-1/part-1",
  "json_url": "https://openlegislation.uk/triton-knoll-offshore-wind-farm-order-2013/schedule-1/part-1.json",
  "legislation": "uksi/2013/1734",
  "legislation_title": "The Triton Knoll Offshore Wind Farm Order 2013",
  "legislation_url": "https://openlegislation.uk/triton-knoll-offshore-wind-farm-order-2013",
  "path": "schedule/1/part/1",
  "kind": "part",
  "number": "1",
  "heading": "Authorised Development",
  "text": "A nationally significant infrastructure project as defined in sections 14 and 15 of the 2008 Act on the bed of the North Sea approximately 33 kilometres off the coast of Lincolnshire and 46 kilometres off the coast of North Norfolk within the Renewable Energy Zone, comprising—\nWork No. 1 — an offshore wind turbine generating station with a gross electrical output capacity of up to 900 MW comprising up to 90 wind turbine generators each fixed to the seabed by one of five foundation types (namely, monopile, jacket, tripod, suction bucket monopod or gravity base foundation), fitted with rotating blades and situated within the coordinates for the Order limits shown on the Works plan and specified below, and including the further works comprising (a) to (c) below;\nCoordinates for the Order limits (Datum: WGS 84)\nPoint\nLatitude (DMS)\nLongitude (DMS)\nPoint\nLatitude (DMS)\nLongitude (DMS)\n1\n53° 29′ 12.732″ N\n0° 41′ 28.839″ E\n2\n53° 31′ 42.626″ N\n0° 42′ 58.367″ E\n3\n53° 32′ 16.234″ N\n0° 51′ 40.692″ E\n4\n53° 24′ 31.248″ N\n0° 59′ 39.385″ E\n5\n53° 24′ 31.234″ N\n0° 56′ 1.766″ E\n(a)up to 2 collector substations fixed to the seabed by jacket or monopile foundations within the Order limits;\n(b)...\n(c)a network of cables laid underground within the Order limits between the wind turbine generators and any collector substation for the transmission of electricity and electronic communications between these different structures, including one or more cable crossings;\n...\n...\nand in connection with such Work No. 1, and to the extent that they do not otherwise form part of any such work, ... associated development within the Order limits comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised project and which fall within the scope of the work assessed by the environmental statement.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 1 Pt. 1 substituted (6.8.2018) by The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 5(2)"
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Words in Sch. 1 Pt. 1 substituted (6.8.2018) by The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 5(3)"
    },
    {
      "type": "F",
      "label": "F3",
      "text": "Words in Sch. 1 Pt. 1 substituted (6.8.2018) by The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 5(4)"
    },
    {
      "type": "F",
      "label": "F4",
      "text": "Words in Sch. 1 Pt. 1 omitted (6.8.2018) by virtue of The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 5(5)"
    },
    {
      "type": "F",
      "label": "F5",
      "text": "Words in Sch. 1 Pt. 1 substituted (6.8.2018) by The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 5(6)"
    },
    {
      "type": "F",
      "label": "F6",
      "text": "Words in Sch. 1 Pt. 1 omitted (6.8.2018) by virtue of The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 5(7)(a)"
    },
    {
      "type": "F",
      "label": "F7",
      "text": "Words in Sch. 1 Pt. 1 omitted (6.8.2018) by virtue of The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 5(7)(b)"
    },
    {
      "type": "F",
      "label": "F8",
      "text": "Words in Sch. 1 Pt. 1 substituted (6.8.2018) by The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 5(8)"
    },
    {
      "type": "F",
      "label": "F9",
      "text": "Word in Sch. 1 Pt. 1 omitted (6.8.2018) by virtue of The Triton Knoll Offshore Wind Farm (Amendment) Order 2018 (S.I. 2018/929), arts. 1, 5(9)"
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 1 Pt. 1 in force at 12.7.2013, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2013/1734/schedule/1/part/1",
    "retrieved_at": "2026-10-29T00:48:05.771191+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}