# The Trunk Road Charging Schemes (Bridges and Tunnels) (Keeping of Accounts) (England) Regulations 2003, Regulation 5: Capital expenditure incurred in connection with a scheme


(1) The costs of constructing any bridge or tunnel of at least 600 metres in length, or any road, where such bridge, tunnel or road is, or is intended to be, comprised in a scheme, shall be regarded by the charging authority as scheme expenses and shall be treated by it as items of capital expenditure.
(2) A charging authority shall regard the following as scheme expenses:
(a) the cost of making improvements to any bridge or tunnel of at least 600 metres in length, or any road, where such bridge, tunnel or road is, or is intended to be, comprised in a scheme;
(b) the cost of providing or improving any collection system;
and where such costs are capital by nature they shall be treated by the charging authority as items of capital expenditure.
(3) The costs under paragraph (1) shall include:
(a) the costs incurred in preparation for or supervision of such construction;
(b) the cost of acquiring any land necessary for the construction; and
(c) any compensation or interest which the charging authority becomes liable to pay in connection with such construction or land acquisition.
(4) The costs under paragraph (2)(b) shall include, in so far as they relate to the provision of a collection system, the costs of planning, procuring and implementing that system.

---
Source: https://www.legislation.gov.uk/uksi/2003/298/regulation/5 (the official version)