# Trunk Road T8 (Toome Bypass) Order (Northern Ireland) 2000, Article 5: Construction of Bridge


The Department shall construct the bridge in the position and with the minimum dimensions both specified in Schedule 2 as part of the Toome Bypass.

---
Source: https://www.legislation.gov.uk/nisr/2000/403/article/5 (the official version)
Page: https://openlegislation.uk/trunk-road-t8-toome-bypass-order-northern-ireland-2000/article-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

