Schedule 2 Toome Bypass Bridge
The centre line of the bridge shall extend from a point on the west bank of the River Bann approximately 550 metres north of the existing road bridge (Ordnance Survey map co-ordinates 299111 and 391332) to a point on the east bank approximately 550 metres north of the existing road bridge (Ordnance Survey map co-ordinates 299202 and 391306) in the townlands of The Creagh (Etre and Otre), County of Londonderry and Brecart (Main Portion), County of Antrim more particularly delineated and coloured red on the map.