Article 2 Correction of original order
The Viking CCS Carbon Dioxide Pipeline Order 2025 is corrected as set out in the table in the Schedule to this Order, where—
(a)
column 1 sets out where the correction is to be made;
(b)
column 2 sets out how the correction is to be made;
(c)
column 3 sets out the text to be substituted, inserted, or omitted.