# The Viking CCS Carbon Dioxide Pipeline Order 2025, Part 1: Authorised development

Extent: E+W

A nationally significant infrastructure project as defined in sections 14 and 21 of the 2008 Act, comprising—
Work No.01 – Construction of AGI at the Immingham facility comprising equipment for the control of the authorised development, within the location shown on Sheet 1 of the Works Plan, including:
(a) a fenced compound area containing;
(i) security lighting;
(ii) parking;
(iii) cathodic protection measures (including grounded);
(iv) CCTV cameras, intrusion detection systems and access control systems;
(v) PIG launcher and receiver facilities (including a projectile blast wall);
(vi) local equipment room;
(vii) control mechanisms and electrical and instrumentation kiosk;
(viii) venting system including vent pipework, valves and vent stack;
(ix) analyser house; and
(x) supporting utilities;
(b) above ground control boxes;
(c) above/below ground pipework and isolation valves;
(d) below ground cables and cable ducts;
(e) hard standing;
(f) drainage works, including creation of connections to existing drainage system; and
(g) landscaping.
Work No.02 – Construction of a 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.1km length between Work No. 1 and Work No. 3 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including pipeline installation in existing crossing sleeve, on existing pipe racks, trenchless installation technique pit works, the creation of reception pits, and launch pits, and installation of concrete-lined sleeve tunnels;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of buried fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 1 of the Works Plan.
Work No.03 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.2km length between Work No.1 and Work No.4 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of buried fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheets 1 and 2 of the Works Plan.
Work No.04 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1km length between Work No. 3 and Work No. 5 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of buried fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 2 of the Works Plan.
Work No.05 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 300 metres length between Work No. 2, Work No. 4, and Work No. 6 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of buried fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 2 of the Works Plan.
Work No.06 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.4km length between Work No. 5 and Work No. 8 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 3 of the Works Plan.
Work No.07 – The creation and use of a temporary logistics and construction compound (North Construction Compound) for the use during the construction of the authorised development, within the location shown on Sheet 4 of the Works Plan, including:
(a) temporary office, welfare and security facilities;
(b) a parking area;
(c) power supplies and lighting;
(d) pipe equipment and fittings storage;
(e) plant storage;
(f) a fabrication area;
(g) workshop/repair facility;
(h) a plant wheel wash area;
(i) waste management areas; and
(j) fencing and gating.
Work No.08 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.8km length between Work No. 6 and Work No. 9 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 5 of the Works Plan.
Work No.09 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 8 and Work No. 10 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 6 of the Works Plan.
Work No.10 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.5km length between Work No. 9 and Work No. 11 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 7 of the Works Plan.
Work No.11 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 10 and Work No. 12 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 8 of the Works Plan.
Work No.12 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.4km length between Work No. 11 and Work No. 13 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 9 of the Works Plan.
Work No.13 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 12 and Work No. 14 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 10 of the Works Plan.
Work No.14 – Construction of a BVS at Washingdales Lane, within the location shown on Sheet 10 of the Works Plan, including:
(a) a fenced compound area containing:
(i) security lighting and CCTV cameras;
(ii) block valve;
(iii) parking area;
(iv) cathodic protection measures;
(v) instrumentation and control kiosk; and
(vi) vent stack;
(b) below ground pipework;
(c) above ground control boxes;
(d) hard standing;
(e) soakaway type drainage system;
(f) landscaping;
and the following temporary requirements during construction activities:
(g) welfare and security facilities;
(h) parking area;
(i) plant and materials storage area; and
(j) temporary waste management facility.
Work No.15 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 2.0km length between Work No. 13 and Work No. 16 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 11 of the Works Plan.
Work No.16 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.9km length between Work No. 15 and Work No. 17 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 12 of the Works Plan.
Work No.17 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 16 and Work No. 18 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 13 of the Works Plan.
Work No.18 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 17 and Work No. 19 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage systems
as shown on Sheet 14 of the Works Plan.
Work No.19 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 18 and Work No. 20 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 15 of the Works Plan.
Work No.20 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 19 and Work No. 21 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 16 of the Works Plan.
Work No.21 – Construction of a BVS at Thoroughfare Road within the location shown on Sheet 16 of the Works Plan, including:
(a) a fenced compound area containing:
(i) security lighting and CCTV cameras;
(ii) block valve;
(iii) parking area;
(iv) cathodic protection measures
(v) instrumentation and control kiosk;
(vi) vent stack.
(b) below ground pipework;
(c) above ground control boxes;
(d) hard standing;
(e) soakaway type drainage system;
(f) landscaping;
and the following temporary requirements during construction activities:
(g) welfare and security facilities;
(h) parking area;
(i) plant and materials storage area; and
(j) temporary waste management facility.
Work No.22 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 21 and Work No. 23 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 17 of the Works Plan.
Work No.23 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 22 and Work No. 24 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 18 of the Works Plan.
Work No.24 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.5km length between Work No. 23 and Work No. 25 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 19 of the Works Plan.
Work No.25 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.9km length between Work No. 24 and Work No. 26 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 20 of the Works Plan.
Work No.26 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 25 and Work No. 27 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 21 of the Works Plan.
Work No.27 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 26 and Work No. 28 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 22 of the Works Plan.
Work No.28 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 27 and Work No. 29 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 23 of the Works Plan.
Work No.29 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 28 and Work No. 30 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 24 of the Works Plan.
Work No.30 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.5km length between Work No. 29 and Work No. 31 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 25 of the Works Plan.
Work No.31 – Construction of a BVS at Louth Road within the location shown on Sheet 25 and Sheet 26 of the Works Plan, including:
(a) a fenced compound area containing:
(i) security lighting and CCTV cameras;
(ii) block valve;
(iii) parking area;
(iv) cathodic protection measures;
(v) instrumentation and control kiosk;
(vi) vent stack;
(b) below ground pipework;
(c) above ground control boxes;
(d) hard standing;
(e) soakaway type drainage system;
(f) landscaping;
and the following temporary requirements during construction activities:
(g) welfare and security facilities;
(h) parking area;
(i) plant and materials storage area; and
(j) temporary waste management facility.
Work No.32 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 31 and Work No. 33 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 26 of the Works Plan.
Work No.33 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.5km length between Work No. 32 and Work No. 34 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 27 of the Works Plan.
Work No.34 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.5km length between Work No. 33 and Work No. 35 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 28 of the Works Plan.
Work No.35 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.8km length between Work No. 34 and Work No. 36 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 29 of the Works Plan.
Work No.36 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 35 and Work No. 37 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 30 of the Works Plan.
Work No.37 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.9km length between Work No. 36 and Work No. 38 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 31 of the Works Plan.
Work No.37a – Construction and use of a temporary access and laydown location at Lordship Road for use during the construction of the authorised development at the location shown on Sheet 31 of the Works Plan including:
(a) temporary office, welfare and security facilities;
(b) a parking area;
(c) laydown / materials storage area;
(d) waste management facilities; and
(e) fencing and gating.
Work No.38 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.9km length between Work No. 37 and Work No. 39 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 32 of the Works Plan.
Work No.39 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 38 and Work No. 40 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 33 of the Works Plan.
Work No.40 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.5km length between Work No. 39 and Work No. 41 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 34 of the Works Plan.
Work No.41 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 437 metres length between Work No. 40 and Work No. 43 including:
(a) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c) installation of underground fibre optic cables for transfer of electronic communications;
(d) construction of a haul road, temporary construction accesses and working areas and laydown area;
(e) reinstatement, ecological and environmental works; and
(f) drainage works including creation of connections to existing drainage system
as shown on Sheet 35 of the Works Plan.
Work No.43 –
(a) construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 304 metres length between Work No. 41 and Work No. 44 including:
(i) construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(ii) installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(iii) installation of underground fibre optic cables for transfer of electronic communications;
(iv) construction of a haul road, temporary construction accesses and working areas and laydown area;
(v) reinstatement, ecological and environmental works; and
(vi) drainage works including creation of connections to existing drainage system
as shown on Sheet 35 of the Works Plan.
Work No.44 –
(a) construction of an AGI comprising equipment for the control and interface of the pipeline to the Theddlethorpe Facility, within the location shown on Sheet 35 of the Works Plan, including:
(i) a fenced compound area containing;
(aa) security lighting;
(bb) parking;
(cc) cathodic protection measures (including groundbeds)
(dd) CCTV cameras, intrusion detection systems and access control systems;
(ee) PIG launcher and receiver facilities (including a projectile blast wall);
(ff) local equipment room;
(gg) supporting infrastructure;
(hh) control mechanisms and electrical and instrumentation kiosk; and
(ii) venting system including vent pipework, valves and vent stack;
(ii) above ground control boxes
(iii) above/below ground pipework and isolation valves;
(iv) below ground cables and cable ducts;
(v) hard standing;
(vi) drainage works, including creation of connections to existing drainage system; and
(vii) landscaping.
Work No.47 – The creation and use of a temporary logistics and construction compound (Southern Construction Compound) for the use during the construction of the authorised development, within the location shown on Sheet 35 of the Works Plan, including:
(a) welfare and security facilities;
(b) a parking area;
(c) temporary lighting;
(d) pipe equipment and fittings storage;
(e) plant storage;
(f) a plant wheel wash area;
(g) waste processing and management areas; and
(h) fencing and gating.
Work No.48 – Removal and replacement of an existing isolation valve with a new isolation valve at the Dune Valve Station, within the location shown on Sheet 36 of the Works Plan.

---
Source: https://www.legislation.gov.uk/uksi/2025/509/schedule/1/part/1 (the official version)