  "url": "https://openlegislation.uk/viking-ccs-carbon-dioxide-pipeline-order-2025/schedule-3/part-1",
  "json_url": "https://openlegislation.uk/viking-ccs-carbon-dioxide-pipeline-order-2025/schedule-3/part-1.json",
  "legislation": "uksi/2025/509",
  "legislation_title": "The Viking CCS Carbon Dioxide Pipeline Order 2025",
  "legislation_url": "https://openlegislation.uk/viking-ccs-carbon-dioxide-pipeline-order-2025",
  "path": "schedule/3/part/1",
  "kind": "part",
  "number": "1",
  "heading": "Streets subject to permanent street works",
  "text": "(1) Area\n(2) Streets subject to street works\n(3) Description of the street works\nIn the borough of North Lincolnshire\nRosper Road\nConstruction of a permanent access to the Immingham facility using existing access ways at either Point 1-AA (Option 1) or Point 1-AB (Option 2) between Points 1- SA and 1-SB as shown on sheet 1 of the access and rights of way plans.\nIn the borough of North Lincolnshire\nA160\nConstruction and installation of the pipeline by trenchless techniques within the A160 to the extent covered by Work No.3 on Sheet 1 the Works Plan.\nIn the borough of North Lincolnshire\nRosper Road, Humber Road\nInstallation and use of cables and fibre optic cables at a designated location along Rosper Road, running through Humber Road to the Immingham facility (between point 1- SA and 1-SB) as shown on sheet 1 of the access and rights of way plans.\nIn the borough of North Lincolnshire\nA180\nConstruction and installation of the pipeline by trenchless techniques within the A180 to the extent covered by Work No.8 on Sheet 5 the Works Plan.\nIn the borough of North East Lincolnshire\nWashingdales Lane\nConstruction of a permanent access to the Work No. 14, point 10-AB as shown on sheet 10 of the access and rights of way plans.\nIn the borough of North East Lincolnshire\nBarton Street (A18), Washingdales Lane\nInstallation and use of cables and fibre optic cables at a designated location along Barton Street running through Washingdales Lane to the Work No. 14 (between point 10-SA and 10-SC) as shown on sheet 10 of the access and rights of way plans.\nIn the borough of North East Lincolnshire\nThoroughfare\nConstruction of a permanent access to Work No. 21, point 16-AB as shown on sheet 16 of the access and rights of way plans.\nIn the district of East Lindsey\nLouth Road\nConstruction of a permanent access to Work No. 31, point 25-AA as shown on sheet 26 of the access and rights of way plans, and Work No. 31a. Installation and use of cables and fibre optic cables at a designated location along Louth Road\nto Work No. 31 (between point 25-SA and 26-SA) as shown on sheets 25 and 26 of the access and rights of way plans.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 3 Pt. 1 in force at 1.5.2025, see art. 1(2)"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/509/schedule/3/part/1",
    "retrieved_at": "2026-10-28T21:16:49.996360+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}