# The Viking CCS Carbon Dioxide Pipeline Order 2025, Part 1: Streets subject to permanent street works

Extent: E+W

(1) Area
(2) Streets subject to street works
(3) Description of the street works
In the borough of North Lincolnshire
Rosper Road
Construction of a permanent access to the Immingham facility using existing access ways at either Point 1-AA (Option 1) or Point 1-AB (Option 2) between Points 1- SA and 1-SB as shown on sheet 1 of the access and rights of way plans.
In the borough of North Lincolnshire
A160
Construction and installation of the pipeline by trenchless techniques within the A160 to the extent covered by Work No.3 on Sheet 1 the Works Plan.
In the borough of North Lincolnshire
Rosper Road, Humber Road
Installation and use of cables and fibre optic cables at a designated location along Rosper Road, running through Humber Road to the Immingham facility (between point 1- SA and 1-SB) as shown on sheet 1 of the access and rights of way plans.
In the borough of North Lincolnshire
A180
Construction and installation of the pipeline by trenchless techniques within the A180 to the extent covered by Work No.8 on Sheet 5 the Works Plan.
In the borough of North East Lincolnshire
Washingdales Lane
Construction of a permanent access to the Work No. 14, point 10-AB as shown on sheet 10 of the access and rights of way plans.
In the borough of North East Lincolnshire
Barton Street (A18), Washingdales Lane
Installation and use of cables and fibre optic cables at a designated location along Barton Street running through Washingdales Lane to the Work No. 14 (between point 10-SA and 10-SC) as shown on sheet 10 of the access and rights of way plans.
In the borough of North East Lincolnshire
Thoroughfare
Construction of a permanent access to Work No. 21, point 16-AB as shown on sheet 16 of the access and rights of way plans.
In the district of East Lindsey
Louth Road
Construction of a permanent access to Work No. 31, point 25-AA as shown on sheet 26 of the access and rights of way plans, and Work No. 31a. Installation and use of cables and fibre optic cables at a designated location along Louth Road
to Work No. 31 (between point 25-SA and 26-SA) as shown on sheets 25 and 26 of the access and rights of way plans.

---
Source: https://www.legislation.gov.uk/uksi/2025/509/schedule/3/part/1 (the official version)
Page: https://openlegislation.uk/viking-ccs-carbon-dioxide-pipeline-order-2025/schedule-3/part-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.