# The Walney Extension Offshore Wind Farm Order 2014, Article 40: Certification of plans etc.

Extent: E+W

(1) The undertaker must, as soon as practicable after the making of this Order, submit to the Secretary of State copies of—
(a) the book of reference;
(b) the CoCP;
(c) the design and access statement;
(d) the environmental statement;
(e) the General Arrangement Drawings;
(f) the important hedgerows plan;
(g) the land plans;
(h) the Noise Monitoring Location Plan;
(i) the Order limits and grid coordinates plan;
(j) the Outline CTMP;
(k) the Public Access Strategy;
(l) the public rights of way plan;
(m) the Schedule of Offshore Maintenance Activities;
(n) the street works plan;
(o) the Transport Statement; and
(p) the works plans,
for certification that they are true copies of the documents referred to in this Order.
(2) A plan or document so certified shall be admissible in any proceedings as evidence of the contents of the document of which it is a copy.

---
Source: https://www.legislation.gov.uk/uksi/2014/2950/article/40 (the official version)
Page: https://openlegislation.uk/walney-extension-offshore-wind-farm-order-2014/article-40
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.