# The Walney Extension Offshore Wind Farm Order 2014, Paragraph 10: Detailed offshore design parameters

Extent: E+W

The total volume of cable protection (excluding cable crossings) for Work No. 3A shall not exceed 109,650m³ with a maximum footprint of 142,139m².

---