# The Walney Extension Offshore Wind Farm Order 2014, Paragraph 2: Details of licensed marine activities

Extent: E+W

(1) Subject to the licence conditions, this licence authorises the undertaker (and any agent or contractor acting on their behalf) to carry out the following licensable marine activities under section 66(1) of the 2009 Act—
(a) the deposit at sea of the substances and articles specified in sub-paragraph (4) below;
(b) the construction of the works set out in sub-paragraph (2) below in or over the sea and/or on or under the sea bed; and
(c) the removal of sediment samples for the purposes of informing environmental monitoring under this licence during pre-construction, construction and operation.
(2) Such activities are authorised in relation to the construction, maintenance and operation of—
Work No. 1 –
(a) an offshore wind turbine generating station with a gross electrical output capacity of up to 750MW comprising up to 207 wind turbine generators with rotating blades, each fixed to the seabed by one of two foundation types, namely monopile foundation or jacket structure (in conjunction with suction caissons or steel piles), and situated within the coordinates for the Order limits seaward of MHWS and further comprising (b) below;
(b) a network of subsea inter-array cables laid within the Order limits seaward of MHWS between the WTGs and Work No. 2(a), for the transmission of electricity and electronic communications between these different structures, including up to twenty cable crossings;
and in connection with such Work No. 1 and to the extent that they do not otherwise form part of any such Works, associated development within the meaning of section 115(2) of the 2008 Act comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised development and which fall within the scope of the work assessed by the environmental statement, including—
(c) scour protection around the foundations of the offshore structures;
(d) cable protection measures such as the placement of rock and/or concrete mattresses, with or without frond devices;
(e) the removal of material from the seabed required for the construction of Work No. 1 and the disposal of up to 600,300m³ of inert material of natural origin within the Disposal Site produced during construction drilling and seabed preparation for foundation works;
and in connection with Work No. 1 such ancillary works which fall within the scope of the work assessed by the environmental statement, including—
(f) creation of temporary landing places, moorings or other means of accommodating vessels in the construction and/or maintenance of the authorised development;
(g) buoys, beacons, fenders and other navigational warning or ship impact protection works.
(3) The grid coordinates for that part of the authorised development comprising Work No. 1 are specified below and more particularly on the Order limits and coordinates plan—
Point ID
Longitude (DMS)
Latitude (DMS)
Point ID
Longitude (DMS)
Latitude (DMS)
WGS 1984
69
3° 52′ 13.576″ W
54° 5′ 53.694″ N
70
3° 52′ 13.657″ W
54° 5′ 53.720″ N
71
3° 52′ 28.915″ W
54° 5′ 58.451″ N
72
3° 55′ 6.038″ W
54° 6′ 47.128″ N
73
3° 55′ 8.026″ W
54° 8′ 10.360″ N
74
3° 53′ 41.626″ W
54° 7′ 56.485″ N
75
3° 53′ 37.752″ W
54° 7′ 56.773″ N
76
3° 49′ 34.856″ W
54° 9′ 30.726″ N
77
3° 39′ 20.455″ W
54° 6′ 19.663″ N
78
3° 40′ 10.211″ W
54° 5′ 35.819″ N
79
3° 40′ 2.050″ W
54° 5′ 24.439″ N
80
3° 39′ 34.391″ W
54° 4′ 45.872″ N
81
3° 39′ 20.491″ W
54° 4′ 26.490″ N
82
3° 39′ 4.540″ W
54° 4′ 8.303″ N
83
3° 38′ 34.710″ W
54° 3′ 34.297″ N
84
3° 37′ 28.711″ W
54° 3′ 26.435″ N
85
3° 36′ 6.282″ W
54° 3′ 7.704″ N
86
3° 35′ 29.688″ W
54° 2′ 56.515″ N
87
3° 35′ 2.285″ W
54° 2′ 48.138″ N
88
3° 34′ 25.262″ W
54° 2′ 33.068″ N
89
3° 33′ 48.240″ W
54° 2′ 17.999″ N
90
3° 33′ 48.186″ W
54° 2′ 17.988″ N
91
3° 32′ 51.202″ W
54° 1′ 46.816″ N
92
3° 31′ 58.620″ W
54° 1′ 8.425″ N
93
3° 31′ 33.298″ W
54° 0′ 44.201″ N
94
3° 34′ 3.925″ W
54° 0′ 13.597″ N
95
3° 37′ 57.802″ W
54° 1′ 26.958″ N
96
3° 38′ 35.961″ W
54° 1′ 38.908″ N
97
3° 38′ 37.941″ W
54° 1′ 39.528″ N
98
3° 38′ 38.113″ W
54° 1′ 39.582″ N
99
3° 38′ 38.136″ W
54° 1′ 39.589″ N
100
3° 38′ 38.137″ W
54° 1′ 39.589″ N
216
3° 39′ 20.898″ W
54° 1′ 52.975″ N
217
3° 39′ 52.373″ W
54° 2′ 2.823″ N
218
3° 40′ 23.852″ W
54° 2′ 12.668″ N
219
3° 41′ 8.463″ W
54° 2′ 26.615″ N
220
3° 41′ 44.621″ W
54° 2′ 37.914″ N
221
3° 43′ 41.800″ W
54° 3′ 14.498″ N
222
3° 44′ 20.928″ W
54° 3′ 26.703″ N
223
3° 45′ 34.687″ W
54° 3′ 49.695″ N
224
3° 46′ 13.432″ W
54° 4′ 1.765″ N
225
3° 46′ 27.742″ W
54° 4′ 6.221″ N
226
3° 46′ 38.749″ W
54° 4′ 9.648″ N
227
3° 46′ 41.500″ W
54° 4′ 10.505″ N
228
3° 46′ 41.511″ W
54° 4′ 10.509″ N
229
3° 46′ 42.021″ W
54° 4′ 10.667″ N
230
3° 46′ 42.055″ W
54° 4′ 10.678″ N
231
3° 46′ 42.083″ W
54° 4′ 10.687″ N
232
3° 46′ 42.129″ W
54° 4′ 10.701″ N
233
3° 46′ 42.131″ W
54° 4′ 10.702″ N
(4) The substances or articles authorised for deposit at sea are—
(a) iron, steel, copper and aluminium;
(b) stone and rock;
(c) concrete;
(d) plastic/synthetic;
(e) material extracted from within the Order limits seaward of MHWS during construction drilling and/or seabed preparation for foundation works; and
(f) marine coatings, other chemicals and timber.
(5) The provisions of section 72 of the 2009 Act shall apply to this licence, save that the provisions of section 72(7) relating to the transfer of the licence shall only apply to a transfer not falling within article 5 of the Order.

---
Source: https://www.legislation.gov.uk/uksi/2014/2950/schedule/9/part/1/paragraph/2 (the official version)
Page: https://openlegislation.uk/walney-extension-offshore-wind-farm-order-2014/schedule-9/part-1/paragraph-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.