# The Waste Management Licensing Regulations (Northern Ireland) 2003, Part II: WASTE DISPOSAL OPERATIONS


N.B. This Part of this Schedule is intended to list disposal operations such as they occur in practice. All waste must be disposed of without endangering human health and without harming the environment.
*Operation Code
Description
D1
Deposit into or onto land (e.g. landfill etc.).
D2
Land treatment (e.g. biodegradation of liquid or sludge discards in soils, etc.).
D3
Deep injection (e.g. injection of pumpable discards into wells, salt domes or naturally occurring repositories, etc.).
D4
Surface impoundment (e.g. placement of liquid or sludgy discards into pits, ponds or lagoons, etc.).
D5
Specially engineered landfill (e.g. placement into lined discrete cells which are capped and isolated from one another and the environment, etc.).
D6
Release into a water body except seas/oceans.
D7
Release to seas/oceans including sea-bed insertion.
D8
Biological treatment not specified elsewhere in this Part of this Schedule which results in final compounds or mixtures which are discarded by means of any of the operations numbered D1 to D12.
D9
Physico-chemical treatment not specified elsewhere in this Part of this Schedule which results in final compounds or mixtures which are discarded by means of any of the operations numbered D1 to D12 (e.g. evaporation, drying, calcination, etc.).
D10
Incineration on land.
D11
Incineration at sea.*
*This operation is prohibited by assimilated law and international conventions.
D12
Permanent storage (e.g. emplacement of containers in a mine, etc.).
D13
Blending or mixing prior to submission to any of the operations numbered D1 to D12 *
*If there is no other D code appropriate, this can include preliminary operations prior to disposal, including pre-processing such as sorting, crushing, compacting, pelletising, drying, shredding, conditioning or separating prior to submission to any of the operations numbered D1 to D12.
D14
Repackaging prior to submission to any of the operations numbered D1 to D13.
D15
Storage pending any of the operations numbered D1 to D14, (excluding temporary storage, pending collection, on the site where the waste is produced.*
* Temporary storage means preliminary storage according to point (10) of Article 3

---
Source: https://www.legislation.gov.uk/nisr/2003/493/schedule/3/part/II (the official version)
Page: https://openlegislation.uk/waste-management-licensing-regulations-northern-ireland-2003/schedule-3/part-II
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

