{
  "url": "https://openlegislation.uk/watchet-harbour-revision-order-2000/article-3",
  "json_url": "https://openlegislation.uk/watchet-harbour-revision-order-2000/article-3.json",
  "legislation": "uksi/2000/1884",
  "legislation_title": "The Watchet Harbour Revision Order 2000",
  "legislation_url": "https://openlegislation.uk/watchet-harbour-revision-order-2000",
  "path": "article/3",
  "kind": "article",
  "number": "3",
  "heading": "Power to construct, etc., works",
  "text": "(1) Subject to the provisions of this Order, the Council may (within the lines and situations shown on the deposited plans and within the limits of deviation and according to the levels shown on the deposited sections) construct and maintain in the harbour the whole or part of the following works:—\nWork No. 1A\nReconstruction, repair and resurfacing of the existing slipway which gives access to the harbour and of the adjacent area forming a boat and trailer park commencing at point 307174 E 143423 N and terminating at point 307124 E 143445 N.\nWork No. 1B\nAn impounding wall of solid construction commencing at point 307124 E 143445 N extending in a north-easterly direction until connecting with the Eastern Pier and terminating at point 307288 E 143514 N and having an overall length of 201 metres and an overall width of 5 metres and including a cill commencing at point 307250 E 143518 N and terminating at point 307254 E 143508 N incorporating a tidal gate structure.\nWork No. 2\nConcrete encasement of the south-western face of the existing sheet pile wall on the Eastern Pier commencing at point 307289 E 143512 N and terminating at point 307340 E 143463 N and having an overall length of 64 metres and of the north-western face of the East Wharf commencing at that point and terminating at point 307252 E 143362 N and having an overall length of 154 metres, together with remedial works to the surface of the East Wharf.\nWork No. 3\nConstruction of a rock armour breakwater in the harbour from west to east between the south-eastern face of the Western Pier at point 307056 E 143500 N and the north-western face of the impounding wall (Work No. 1B) at point 307131 E 143453 N and north of the houses which front onto Market Street.\nWork No. 4\nExcavation of a trench and construction of a sediment disposal pipe 115 metres in length to be laid in the trench beneath the harbour bed running due north from its junction with Work No. 1B immediately south of the western limit of the Eastern Pier at point 307235 E 143501 N and terminating to the north and east of the eastern limit of the Western Pier at point 307240 E 143615 N.\nWork No. 5\nConstruction of a concrete slipway 80 metres in length running along and abutting the south-eastern side of the Western Pier commencing at point 307041 E 143492 N and terminating at point 307101 E 143545 N with a gradient of 1:12.\nWork No. 6\nDeepening by way of dredging or excavation of the bed of the harbour where it forms the marina basin and at the entrance to the harbour formed by Western Pier and the Eastern Pier as shown by cross-hatching on the deposited plan.\n(2) The Council may, within the limits of deviation, from time to time alter, enlarge, replace, relay, extend or reconstruct temporarily or permanently the authorised works.\n(3) During construction of the works Council shall implement the mitigation measures set out in Section 4 (Impact Assessment and Mitigation Measures) of the Environmental Statement.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2000/1884/article/3",
    "retrieved_at": "2026-10-29T09:05:54.364884+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}