# The Water Infrastructure Adoption (Prescribed Water Fittings Requirements) (England) Regulations 2017, Introduction: Introductory text

Extent: E+W

Water Industry, England
Made 15th August 2017
Laid before Parliament 18th August 2017
Coming into force 1st October 2017
The Secretary of State makes these Regulations in exercise of the powers conferred by section 51B(6) of the Water Industry Act 1991.

---
Source: https://www.legislation.gov.uk/uksi/2017/841/introduction (the official version)
Page: https://openlegislation.uk/water-infrastructure-adoption-prescribed-water-fittings-requirements-england-regulations-2017/introduction
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

