# The Water Protection Zone (River Dee Catchment) (Procedural and Other Provisions) Regulations 1999, Paragraph 1


The following is required—
(a) a site map;
(b) a substance location plan;
(c) a substance specification statement;
(d) a safety and emergency statement; and
(e) where the controlled substance is to be used in a manufacturing, treatment or other industrial process, a process specification statement.

---
Source: https://www.legislation.gov.uk/uksi/1999/916/schedule/1/paragraph/1 (the official version)
Page: https://openlegislation.uk/water-protection-zone-river-dee-catchment-procedural-and-other-provisions-regulations-1999/schedule-1/paragraph-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

