# The Water Protection Zone (River Dee Catchment) (Procedural and Other Provisions) Regulations 1999, Paragraph 6


The process specification statement required by paragraph 1(e) shall contain a general description of the process, a description of the major items of plant which will contain the substance and a statement of the maximum quantity (by volume or weight as appropriate) which is liable to be kept or used in the major items of the plant.

---
Source: https://www.legislation.gov.uk/uksi/1999/916/schedule/1/paragraph/6 (the official version)
Page: https://openlegislation.uk/water-protection-zone-river-dee-catchment-procedural-and-other-provisions-regulations-1999/schedule-1/paragraph-6
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

