Paragraph 1
The following is required—
(a)
a copy of the relevant consent and a change of control plan;
(b)
details of the controlled substances kept or used, or proposed to be kept or used within the site, or that part of the site to be subject to the proposed change of control, the maximum quantity (by volume or weight as appropriate) of each of them kept or used or proposed to be kept or used and their density and solubility in water;
(c)
a description of the use of each area of the site identified in the change of control plan and a description of any relevant changes in circumstances since the consent was granted; and
(d)
a safety and emergency statement.