Article 2 Extension of time period in section 27(1) of the Waverley Railway (Scotland) Act 2006
The period referred to in section 27(1) of the Waverley Railway (Scotland) Act 2006 is extended until 23rd July 2016.
The period referred to in section 27(1) of the Waverley Railway (Scotland) Act 2006 is extended until 23rd July 2016.