# Waverley Railway (Scotland) Act 2006, Paragraph


Railway between the Millerhill Marshalling Yard and Old Dalkeith Road—
Work No. 1—A railway (3,600 metres in length) commencing by joining the Niddrie North Junction-Bilston Glen line (Edinburgh CrossailRail to Newcraighall) at a point in the Millerhill Marshalling Yard 7 metres south-west of the south-western corner of the bridge carrying Whitehall Road over the northern rail entrance to the Millerhill Marshalling Yard and terminating at a point 50 metres north of the bridge carrying Old Dalkeith Road (A68) over the Penicuik-Musselburgh Foot & Cycleway. Work No. 1 includes a bridge under the City of Edinburgh Bypass (A720) and a culvert to carry Dean Burn under the intended railway. Work No. 1 includes a station at Shawfair.
Work No. 1A—A bridge over the intended railway (Work No. 1) to provide access for the proposed Shawfair development.
Work No. 1B—An access road commencing by a junction with Work No. 1C at a point 117 metres south-west of the entrance to the CPL Distribution Depot on the unnamed road forming the western continuation of Newton Church Road and terminating at that entrance.
Work No. 1C—A realignment of the unnamed road forming the western continuation of Newton Church Road and of Newton Church Road commencing at a point in that unnamed road 190 metres south-west of the entrance to the CPL Distribution Depot on the unnamed road, passing over the intended railway (Work No. 1) and terminating at a point 195 metres north-east of the north-eastern corner of Hope Cottage. Work No. 1C includes a bridge over the intended railway (Work No. 1).
Work No. 1D—A road commencing by a junction with Work No. 1C at a point 200 metres north-east of the north-eastern corner of Hope Cottage and terminating by a junction with Newton Church Road at a point 110 metres north-east of the north-eastern corner of Hope Cottage.
Work No. 1E—A footbridge over the intended railway (Work No. 1) to provide access for the proposed station at Shawfair.
Work No. 1F—A footbridge over the intended railway (Work No. 1) at Longthorn between the junction of Newton Village with Newton Church Road and a point 105 metres south-east of the south-eastern corner of Hope Cottage.
Work No. 1G—A road commencing by a junction with Millerhill Road (A6106) and the commencement of Work No. 1J, at a point 222 metres west of the roundabout at the junction of that road and Old Craighall Road (B6415), passing over the intended railway (Work No. 1) and terminating at a point 253 metres north of that roundabout. Work No. 1G includes a bridge over the intended railway (Work No. 1).
Work No. 1H—A road commencing by a junction with Work No. 1G at a point 235 metres north of the roundabout at the junction of Millerhill Road (A6106) and Old Craighall Road (B6415) and terminating by a junction with Old Craighall Road at a point 160 metres north-east of that roundabout.
Work No. 1J—A realignment of Millerhill Road (A6106) commencing by a junction with that road at the commencement of Work No. 1G and terminating by a junction with Millerhill Road at a point 215 metres south of the access road leading to Sheriffhall Mains.
Work No. 1K—A road commencing by a junction with the access road leading to Sheriffhall Mains at a point 340 metres south of the roundabout at the junction of Millerhill Road (A6106) and Old Craighall Road (B6415) and terminating by a junction with Work No. 1J at a point 282 metres south-west of that roundabout. Work No. 1K includes a bridge over the intended railway (Work No. 1).

---
Source: https://www.legislation.gov.uk/asp/2006/13/schedule/1/paragraph/wrapper3 (the official version)
Page: https://openlegislation.uk/waverley-railway-scotland-act-2006/schedule-1/paragraph-wrapper3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

