  "url": "https://openlegislation.uk/waverley-railway-scotland-act-2006/schedule-1/paragraph-wrapper9",
  "json_url": "https://openlegislation.uk/waverley-railway-scotland-act-2006/schedule-1/paragraph-wrapper9.json",
  "legislation": "asp/2006/13",
  "legislation_title": "Waverley Railway (Scotland) Act 2006",
  "legislation_url": "https://openlegislation.uk/waverley-railway-scotland-act-2006",
  "path": "schedule/1/paragraph/wrapper9",
  "kind": "paragraph",
  "number": null,
  "heading": null,
  "text": "In the local government area of Scottish Borders—\nWork No. 5A—A realignment of the A7 road commencing at a point in that road 120 metres north of the existing junction of the private road leading to Falahill Farm with the A7 road and terminating at a point in the A7 road adjacent to No. 6 Falahill Cottages. Work No. 5A includes a bridge over the intended railway (Work No. 5).\nWork No. 5B—A road commencing by a junction with Work No. 5A at a point 70 metres south of the existing junction of the private road leading to Falahill Farm with the A7 road and terminating by a junction with that private road at a point 120 metres south-west of that existing road junction.\nWork No. 5C—A footbridge over the intended railway (Work No. 5) at the former Heriot Station to replace the length of Heriot Way between points E3 and E4.\nWork No. 5D—A road commencing by a junction with the B709 road at a point 120 metres south of the existing junction of Old Stage Road (C11) with the B709 and terminating by a junction with the A7 road at a point 233 metres north-east of that existing road junction. Work No. 5D includes a bridge over the intended railway (Work No. 5) and earthworks for a visibility splay at its junction with the A7 road. Work No. 5D also includes a diversion of Gala Water from its existing course between points E7, E8 and E10 to a new course between points E7, E9 and E10.\nWork No. 5E—A road commencing by a junction with Work No. 5D at a point 33 metres north of the existing junction of Old Stage Road (C11) with the B709 road and terminating by a junction with the B709 75 metres north-west of that existing road junction.\nWork No. 5F—A road commencing by a junction with Work No. 5D at a point 40 metres south of the existing junction of Old Stage Road (C11) with the B709 road and terminating by a junction with Old Stage Road 130 metres south-east of that road junction.\nWork No. 5G—An improvement of the Hangingshaw branch of the C11 road between a point 112 metres south of the junction of that branch road with the A7 road and the junction with Old Stage Road (C11). Work No. 5G includes a bridge over the intended railway (Work No. 5).",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/asp/2006/13/schedule/1/paragraph/wrapper9",
    "retrieved_at": "2026-10-29T20:16:10.184396+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}