Regulation 22 Pre-testing requirements
Every filling machine submitted for testing shall be completely assembled and in a clean condition.
A filling machine, other than one which has been transported without having been dismantled, shall not be tested, passed as fit for use for trade and stamped unless it has been completely erected ready for use and installed in the position in which it is to be used.
For the purposes of the performance by an inspector of his functions under the Order or these Regulations relating to inspection, testing, passing as fit for use for trade and stamping of any filling machine, a person submitting such a machine to an inspector or who an inspector has reasonable cause to believe has control of such a machine for use for trade shall, if requested, make available for the inspector's use such material in his possession as the inspector may reasonably require, and this material shall be returned to the person in question.