Regulation 25 Marking of discontinuous totalisers
Every discontinuous totaliser passed as fit for use for trade on or after the date of coming into operation of these Regulations shall be legibly and durably marked, in addition to the markings required by Regulation 11, with:—
(a)
the maximum capacity of the load receptor;
(b)
the minimum load for automatic operation;
(c)
either—
(i)
the maximum number of discharges of material per hour, or
(ii)
the maximum load weighed and totalised per hour;
(d)
the minimum totalised load; and
(e)
the totalisation scale interval.