Article 6 Power to deviate

Original text. Later amendments are not shown.

In constructing or maintaining any of the scheduled works, the undertaker may—

(a)

deviate laterally from the lines or situations shown on the deposited plans within the limits of deviation for that work shown on those plans; and

(b)

deviate vertically from the levels shown on the deposited sections—

(i)

to any extent not exceeding 1.5 metres upwards; or

(ii)

to any extent downwards.