# The Welsh Highland Railway Order 1999, Schedule 6: LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN OR USE MADE


(1)
(2)
(3)
(4)
Area
Number of land shown on deposited plans
Purpose for which temporary possession may be taken
Authorised work
Llanwnda
4
Access to railway formation and bridge works
Work No. 1 (part)
5
New access track to be constructed on landowner’s own land
Work No. 1a
Betws Garmon
4
Access to railway formation
Work No. 1 (part)
5
Existing bridge to be rebuilt
Work No. 1 (part)
6
Existing bridge to be rebuilt
Work No. 1 (part)
7
Existing bridge to be rebuilt
Work No. 1 (part)
8
Existing bridge to be rebuilt
Work No. 1 (part)
9
Access for works
Work No. 1 (part)
10
Existing accommodation over bridge to be rebuilt in altered position
Work No. 1d
11
Existing accommodation over bridge to be rebuilt in altered position
Work No. 1d
13
Existing bridge to be rebuilt
Work No. 1 (part)
14
Existing bridge to be rebuilt and access to highway used
Work No. 1 (part)
15
Existing bridge to be rebuilt and new access track to be made on landowner’s own land
Work No. 1c
16
New access track to be made on landowner’s own land
Work No. 1c
17
Existing bridge to be rebuilt
Work No. 1 (part)
18
Existing bridge to be rebuilt
Work No. 1 (part)
19
New access track to be made on landowner’s own land
Work No. 1e
20
New access track to be made on landowner’s own land
Work No. 1e
22
Temporary work site
Work No. 1 (part)
23
Existing bridge to be rebuilt
Work No. 1 (part)
24
Existing bridge to be rebuilt
Work No. 1 (part)
25
Existing bridge to be rebuilt
Work No. 1 (part)
26
Existing bridge to be rebuilt
Work No. 1 (part)
29
Access route and drainage works
Work No. 1 (part)
30
Drainage works
Work No. 1 (part)
31
For access and bridleway diversion
Work No. 1 (part)
31A
Access for bridge to be repaired
Work No. 1 (part)
31B
Access for bridge to be repaired
Work No. 1 (part)
31C
Access for bridge to be repaired
Work No. 1 (part)
31D
Access for bridge to be repaired
Work No. 1 (part)
31E
Access for bridge to be repaired
Work No. 1 (part)
32
Public footpath to be diverted
Work No. 1 (part)
Beddgelert
2
Public bridleway to be diverted
Work No. 2 (part)
2A
For access
Work No. 2 (part)
2B
For footpath to be created between car park and station by easement over landowner’s own land
Work No. 2 (part)
15
Construction of access track
Work No. 2a
20
Existing bridge to be rebuilt
Work No. 2 (part)
21
New access track to be created on landowner’s own land
Work No. 2b
22
Existing bridge to be rebuilt
Work No. 2 (part)
Llanfrothen
2
Existing bridge to be rebuilt
Work No. 2 (part)
3
Existing bridge to be rebuilt
Work No. 2 (part)
Dolbenmaen
2
Level crossing to be rebuilt
Level crossing No. 4
Porthmadog
3
Occupation and public bridleway crossing to be rebuilt
Work No. 2 (part)
5
Level crossing to be rebuilt
Work No. 2 (part)
6
Pottery entrance to be reformed
Work No. 2 (part)
7
For traffic signals to be installed
Level crossing No. 5
15
For bridge works
Work No. 3 (part)
16
For railway track, road reconstruction, traffic signals to be installed and for widening of the Cob
Level crossing No. 6
17
For railway track, road reconstruction and traffic signals to be installed
Level crossing No. 6
18
Station improvements on own land
Work No. 3 (part)
19
For widening of the Cob
Work No. 3 (part)

---
Source: https://www.legislation.gov.uk/uksi/1999/2129/schedule/6 (the official version)
Page: https://openlegislation.uk/welsh-highland-railway-order-1999/schedule-6
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

