Paragraph 5 Detailed design
In relation to Work No. 1, Work No. 2, Work No. 4 and Work No. 5, no development must commence until details of the following, where relevant for that Work have, after consultation with West Lindsey District Council and the Lead Local Flood Authority, been submitted to and approved by the relevant planning authority—
the siting, layout, scale and external appearance, including the colour, materials and surface finishes of all new permanent buildings and structures;
finished floor levels;
hard standings;
the internal vehicular access and circulation roads, loading and unloading, vehicle parking and turning facilities, cycle parking and routes and pedestrian facilities and routes; and
surface water management.
Work No. 1, Work No. 2, Work No. 4 and Work No. 5 unless otherwise agreed with the relevant planning authority must be carried out in accordance with the approved details.
Unless otherwise agreed with the relevant planning authority if a single OCGT is installed the details approved by the relevant planning authority under paragraph (1) must be in accordance with table 1.
Table 1
Main Dimensions for Single OCGT
| Component | Maximum length (m) | Maximum width (m) | Maximum height (mAGL/ mAOD) | Minimum height (mAGL) |
|---|---|---|---|---|
| Minimum final ground height (mAOD) | +7.1m | |||
| Maximum final ground height (mAOD) | +14m | |||
| Single Gas Turbine, Exhaust gas diffuser, Generator and Air inlet filter (Work No. 1(a)) | 50 | 20 | 27/41 | - |
| Gas Turbine building (if required) (Work No. 1(a)) | 36 | 12 | 19/33 | - |
| Stack(s) (Work No. 1(a)) | 10m diameter | 45/59 | 40 | |
| Auxiliary closed loop cooling equipment (Work No. 1(c)) | 30 | 15 | 12/26 | - |
| Workshop, Stores, Control, Administration and Welfare Buildings (Work No. 4(c)) | 40 | 30 | 10/24 | - |
| Raw Water / Fire Water Storage tank (Work No. 4(d)) | 15m diameter | 7/21 | - | |
| Gas receiving areas, gas treatment facilities, compression station and other auxiliary control cabinets and equipment (Work No. 2) | 60 | 45 | 7/21 | - |
Unless otherwise agreed with the relevant planning authority if up to 5 OCGT units are installed the details approved by the relevant planning authority under paragraph (1) must be in accordance with table 2.
Table 2
Main Dimensions for Up to 5 Gas Turbines
| Component | Maximum length (m) | Maximum width (m) | Maximum height (mAGL/ mAOD) | Minimum height (mAGL) |
|---|---|---|---|---|
| Minimum final ground height (mAOD) | +7.1m | |||
| Maximum final ground height (mAOD) | +14m | |||
| Each Single Gas Turbine and Generator (Work No. 1(a)) | 35 | 12 | 15/29 | - |
| Each Stack (Work No. 1(a)) | 5m diameter | 45/59 | 35 | |
| Banking Compound Area (Work No. 1) | 52 | 48 | 8/22 | - |
| Workshop, Stores, Control, Administration and Welfare Buildings (Work No. 4(c)) | 40 | 30 | 10/24 | - |
| Raw Water / Fire Water Storage Tank (Work No. 4(d)) | 15m diameter | 7/21 | - | |
| Gas receiving areas, gas treatment facilities, compression station and other auxiliary control cabinets and equipment (Work No. 2) | 60 | 45 | 7/21 | - |