# The West Midlands Rail Freight Interchange Order 2020, Paragraph


The A5/A449 link road the general arrangement of which is shown on the highway general arrangement plans and bridge plans including—
(a) footways and cycleways;
(b) construction of a new three arm roundabout on the A5;
(c) construction of a left in and left out junction with Harrisons Lane;
(d) construction of a new four arm roundabout on the A449;
(e) new bridges over the railway and canal as shown on the bridge plans;
(f) works comprising the interface with Works Nos. 5 and 7;
(g) removal of existing laybys on the A5;
(h) closure of the existing accesses on the A5 as shown on the access and rights of way plans;
(i) upgrading of existing footway on the north side of the A5 to a cycleway;
(j) bus stops and bus laybys on the A5/A449 link road;
(k) bus laybys on the A449;
(l) removal of bridge over West Coast Main Line Loop railway;
(m) street lighting;
(n) construction of new maintenance access points to the rail lines on the east and west (the latter through the rail terminal) of the West Coast Main Line Loop railway;
(o) drainage and attenuation structures;
(p) diversion and culverting of the existing canal feeder drain; and
(q) installation of new service crossings below the public highway.

---
Source: https://www.legislation.gov.uk/uksi/2020/511/schedule/1/part/1/paragraph/wrapper12n1 (the official version)
Page: https://openlegislation.uk/west-midlands-rail-freight-interchange-order-2020/schedule-1/part-1/paragraph-wrapper12n1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.