# The West Midlands Rail Freight Interchange Order 2020, Paragraph 1

Extent: E+W+S+N.I.

Documents for certification that they are true copies of the documents referred to in this Order
(1) Document/Plan
(2) Document Number
(3) Document date/Plan number with revision number
Access and rights of way plans
Key Plan
2.3
WSP-70001979-SK-060 Rev I
Sheet 1
2.3A
WSP-70001979-SK-060 Rev H
Sheet 2
2.3B
WSP-70001979-SK-060 Rev G
Sheet 3
2.3C
WSP-70001979-SK-060 Rev F
Sheet 4
2.3D
WSP-70001979-SK-060 Rev F
Sheet 5
2.3E
WSP-70001979-SK-060 Rev F
Sheet 6
2.3F
WSP-70001979-SK-060 Rev F
Sheet 7
2.3G
WSP-70001979-SK-060 Rev B
The book of reference
4.3B
21 August 2019
The bridge plans
Proposed road bridges plan and long section
2.18A
1516-0425-WDK-SI-C-301-010 Rev P11
Road Bridge B1
2.18B
1516-0425-WDK-SI-C-301-006 Rev P14
Road Bridge B2 and B3
2.18C
1516-0425-WDK-SI-C-300-007 Rev P14
Proposed road bridge B4 section and elevation
2.18D
1516-0425-WDK-SI-C-301-008 Rev P17
The design and access statement
7.5
3 August 2018
The environmental statement
6.2
3 August 2018 (subject to the
substitutions set out below):
(i) Figures 10.001, 10.002, 10.003 and
10.004 – 12 September 2018;
(ii) Annex 10.1.1 – 12 September
2018;
(iii) Addendum to Chapter 13 (Noise
and Vibration) – 5 April 2019
(iv) Appendix I to Transport
Assessment (Appendix 15.1) (Site
Wide HGV Management Plan) – 7
May 2019
(v) Appendix H to Transport
Assessment (Appendix 15.1) (Site
Wide Travel plan) – 5 July 2019
(vi) Appendix 2.3 (Outline Demolition
and Construction Management Plan) –
5 July 2019
(vii) Appendix 10.4 (Framework
Ecological Mitigation and
Management Plan) – 5 July 2019
(viii) Updated Chapter 7 (Air Quality)
and Appendices 7.2, 7.3, 7.4, 7.6 and
7.7 – 7 August 2019
The future highways maintenance plans
Key Plan
2.10
WSP-70001979-SK-091 Rev F
Sheet 1
2.10A
WSP-70001979-SK-091 Rev F
Sheet 2
2.10B
WSP-70001979-SK-091 Rev C
Sheet 3
2.10C
WSP-70001979-SK-091 Rev C
The highway classification plans
Key Plan
2.13
WSP-70001979-SK-068 Rev I
Sheet 1
2.13A
WSP-70001979-SK-068 Rev H
Sheet 2
2.13B
WSP-70001979-SK-068 Rev E
Sheet 3
2.13C
WSP-70001979-SK-068 Rev E
The highway general arrangement plans
Key Plan/Highway Masterplan
2.9
WSP-70001979-GA-100 Rev M
General Arrangement Plan 101
2.9A
WSP-70001979-GA-101 Rev E
General Arrangement Plan 102
2.9B
WSP-70001979-GA-102 Rev E
General Arrangement Plan 103
2.9C
WSP-70001979-GA-103 Rev I
General Arrangement Plan 104
2.9D
WSP-70001979-GA-104 Rev M
General Arrangement Plan 105
2.9E
WSP-70001979-GA-105 Rev E
General Arrangement Plan 106
2.9F
WSP-70001979-GA-106 Rev G
General Arrangement Plan 107
2.9G
WSP-70001979-GA-107 Rev H
General Arrangement Plan 108
2.9H
WSP-70001979-GA-108 Rev F
General Arrangement Plan 109
2.9I
WSP-70001979-GA-109 Rev G
General Arrangement Plan 110
2.9J
WSP-70001979-GA-110 Rev H
General Arrangement Plan 111
2.9K
WSP-70001979-GA-111 Rev H
The land plans
Key Plan
2.1
Key Plan v1
Sheet 1
2.1A
Sheet 1 of 12 v0
Sheet 2
2.1B
Sheet 2 of 12 v0
Sheet 3
2.1C
Sheet 3 of 12 v0
Sheet 4
2.1D
Sheet 4 of 12 v1
Sheet 5
2.1E
Sheet 5 of 12 v0
Sheet 6
2.1F
Sheet 6 of 12 v0
Sheet 7
2.1G
Sheet 7 of 12 v0
Sheet 8
2.1H
Sheet 8 of 12 v0
Sheet 9
2.1I
Sheet 9 of 12 v0
Sheet 10
2.1J
Sheet 10 of 12 v0
Sheet 11
2.1K
Sheet 11 of 12 v0
Sheet 12
2.1L
Sheet 12 of 12 v0
Order limits plan
2.4
4990-00011 Rev 06
The parameters plans
Development Zone Parameters Plan
Key Plan
2.5
4990-02000 Rev 11
Sheet 1
2.5A
4990-02001 Rev 11
Sheet 2
2.5B
4990-02002 Rev 08
Sheet 3
2.5C
4990-02003 Rev 12
Sheet 4
2.5D
4990-02004 Rev 07
Floor Levels and Building Heights
Parameters Plan
Key Plan
2.6
4990-02010 Rev 12
Sheet 1
2.6A
4990-02011 Rev 11
Sheet 2
2.6B
4990-02012 Rev 07
Sheet 3
2.6C
4990-02013 Rev 11
Sheet 4
2.6D
4990-02014 Rev 07
Green Infrastructure Parameters Plan
Key Plan
2.7
4990-02020 Rev 14
Sheet 1
2.7A
4990-02021 Rev 13
Sheet 2
2.7B
4990-02022 Rev 10
Sheet 3
2.7C
4990-02023 Rev 14
Sheet 4
2.7D
4990-02024 Rev 09
The illustrative arrangement of railway alignment
2.14
TRS-DRG-FA-001003 Rev 05
The rail terminal – illustrative expanded rail terminal layout plan
2.15B
TRS-DRG-FA-001010 Rev 04
The rail section plans
Rail Alignment Cross Sections – Sheet 1
2.16A
TRS-DRG-FA-001005 Rev 02
Rail Alignment Cross Sections – Sheet 2
2.16B
TRS-DRG-FA-001006 Rev 03
Rail Alignment Cross Sections – Sheet 3
2.16C
TRS-DRG-FA-001007 Rev 02
Long sections rail alignment Sheet 1
2.16D
TRS-DRG-FA-001004 Rev 02
Long sections rail alignment Sheet 2
2.16E
TRS-DRG-FA-001008 Rev 02
The speed limit plans
Key Plan
2.12
WSP-70001979-SK-062 Rev I
Sheet 1
2.12A
WSP-70001979-SK-062 Rev K
Sheet 2
2.12B
WSP-70001979-SK-062 Rev F
Sheet 3
2.12C
WSP-70001979-SK-062 Rev E
SI facility plan
2.20
01
The traffic regulation plans
Key Plan
2.11
WSP-70001979-SK-061 Rev I
Sheet 1
2.11A
WSP-70001979-SK-061 Rev H
Sheet 2
2.11B
WSP-70001979-SK-061 Rev E
Sheet 3
2.11C
WSP-70001979-SK-061 Rev F
Sheet 4
2.11D
WSP-70001979-SK-061 Rev A
The works plans
Key Plan
2.2
Key Plan v3.0
Sheet 1
2.2A
Sheet 1 of 9 v3.0
Sheet 2
2.2B
Sheet 2 of 9 v3.0
Sheet 3
2.2C
Sheet 3 of 9 v1
Sheet 4
2.2D
Sheet 4 of 9 v1
Sheet 5
2.2E
Sheet 5 of 9 v1
Sheet 6
2.2F
Sheet 6 of 9 v3.0
Sheet 7
2.2G
Sheet 7 of 9 v1
Sheet 8
2.2H
Sheet 8 of 9 v1
Sheet 9
2.2I
Sheet 9 of 9 v1

---
Source: https://www.legislation.gov.uk/uksi/2020/511/schedule/15/paragraph/1 (the official version)
Page: https://openlegislation.uk/west-midlands-rail-freight-interchange-order-2020/schedule-15/paragraph-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

