# The West Midlands Rail Freight Interchange Order 2020, Part 1: ROADS SUBJECT TO 30MPH SPEED LIMIT


(1) Location
(2) Length
A5/A449 link road
Shown coloured pink between points marked A and B as shown on the speed limits plans (Document 2.12A).
Vicarage Road link
Shown coloured pink between points marked C and C1 as shown on the speed limits plans (Document 2.12A and 2.12B).
Private Estate Roads
Shown coloured orange between points C and D as shown on the speed limits plans (Document 2.12B).
Private Estate Roads
Shown coloured orange between points marked C2 and C3 as shown on the speed limits plans (Document 2.12B).
Private Estate Roads
Shown coloured orange between points marked C4 and C5 as shown on the speed limits plans (Document 2.12B).
Private Estate Roads
Shown coloured orange between points marked E and E1 as shown on the speed limits plans (Document 2.12B).

---
Source: https://www.legislation.gov.uk/uksi/2020/511/schedule/8/part/1 (the official version)
Page: https://openlegislation.uk/west-midlands-rail-freight-interchange-order-2020/schedule-8/part-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

