{
  "url": "https://openlegislation.uk/west-midlands-rail-freight-interchange-order-2020/schedule-9/part-1",
  "json_url": "https://openlegislation.uk/west-midlands-rail-freight-interchange-order-2020/schedule-9/part-1.json",
  "legislation": "uksi/2020/511",
  "legislation_title": "The West Midlands Rail Freight Interchange Order 2020",
  "legislation_url": "https://openlegislation.uk/west-midlands-rail-freight-interchange-order-2020",
  "path": "schedule/9/part/1",
  "kind": "part",
  "number": "1",
  "heading": "AMENDMENTS TO EXISTING ORDERS",
  "text": "(1) Statutory Instrument/ Order Title\n(2) Statutory Instrument Number if applicable\n(3) Changes\n(4) Event\nThe Worcester-Wolverhampton South of Stafford Trunk Road (Prohibition of Waiting) (Clearways) Order 1965\n1965 No. 427\nNew side road Terminals Signs to be added to Highways Agency Drawing M91226008/A449_02 at A5/A449 link road.\nUpon the opening of the A449 roundabout to public traffic as shown on the highway general arrangement plans (Document 2.9C).\nProhibition of waiting on verges along the section of the A5 between points AA and BB as shown on the traffic regulation plans (Document 2.11A).\nUpon the commencement of construction of the A5 roundabout as shown on the highway general arrangement plans (Document 2.9G).\nThe Trunk Road (A449) (Stafford Road, Coven Heath) (Clearway) Order 1986\n1986 No. 885\nNew side road Terminals Signs to be added to Highways Agency Drawing M91226008/A449_02 at A5/A449 link road.\nUpon the opening of the A449 roundabout to public traffic as shown on the highway general arrangement plans (Document 2.9C).\nProhibition of waiting on verges along the section of the A449 between points CC and DD as shown on the traffic regulation plans (Document 2.11A and 2.11D).\nUpon the commencement of construction of the relocated A449 laybys as shown on the highway general arrangement plans (Document 2.9E).\nThe London-Holyhead Trunk Road (Prohibition of Waiting) (Clearways) Order 1969\n1969 No. 1576\nNew side road Terminals Signs to be added to Highways Agency Drawing M91226005/DRA5E_01 at new junction with A5/A449 link road.\nUpon the opening of the A5 roundabout to public traffic as shown on the highway general arrangement plans (Document 2.9G).\nProhibition of waiting on verges along the section of the A5 between points AA and BB as shown on the traffic regulation plans (Document 2.11A).\nUpon the commencement of construction of the A5 roundabout as shown on the highway general arrangement plans (Document 2.9G).\nThe West Midlands Trunk Road (Prohibition of Waiting) (Clearways) Amendment Order 1989\n1989 No. 1037\nNew side road Terminals Signs to be added to Highways Agency Drawing M91226005/DRA5E_01 at new junction with A5/A449 link road.\nUpon the opening of the A5 roundabout to public traffic as shown on the highway general arrangement plans (Document 2.9G).\nProhibition of waiting on verges along the section of the A449 between points CC and DD as shown on the traffic regulation plans (Document 2.11A and 2.11D).\nUpon the commencement of construction of the relocated A449 laybys as shown on the highway general arrangement plans (Document 2.9E).",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2020/511/schedule/9/part/1",
    "retrieved_at": "2026-10-28T22:30:21.235096+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}