# The West Midlands Rail Freight Interchange Order 2020, Part 1: AMENDMENTS TO EXISTING ORDERS


(1) Statutory Instrument/ Order Title
(2) Statutory Instrument Number if applicable
(3) Changes
(4) Event
The Worcester-Wolverhampton South of Stafford Trunk Road (Prohibition of Waiting) (Clearways) Order 1965
1965 No. 427
New side road Terminals Signs to be added to Highways Agency Drawing M91226008/A449_02 at A5/A449 link road.
Upon the opening of the A449 roundabout to public traffic as shown on the highway general arrangement plans (Document 2.9C).
Prohibition of waiting on verges along the section of the A5 between points AA and BB as shown on the traffic regulation plans (Document 2.11A).
Upon the commencement of construction of the A5 roundabout as shown on the highway general arrangement plans (Document 2.9G).
The Trunk Road (A449) (Stafford Road, Coven Heath) (Clearway) Order 1986
1986 No. 885
New side road Terminals Signs to be added to Highways Agency Drawing M91226008/A449_02 at A5/A449 link road.
Upon the opening of the A449 roundabout to public traffic as shown on the highway general arrangement plans (Document 2.9C).
Prohibition of waiting on verges along the section of the A449 between points CC and DD as shown on the traffic regulation plans (Document 2.11A and 2.11D).
Upon the commencement of construction of the relocated A449 laybys as shown on the highway general arrangement plans (Document 2.9E).
The London-Holyhead Trunk Road (Prohibition of Waiting) (Clearways) Order 1969
1969 No. 1576
New side road Terminals Signs to be added to Highways Agency Drawing M91226005/DRA5E_01 at new junction with A5/A449 link road.
Upon the opening of the A5 roundabout to public traffic as shown on the highway general arrangement plans (Document 2.9G).
Prohibition of waiting on verges along the section of the A5 between points AA and BB as shown on the traffic regulation plans (Document 2.11A).
Upon the commencement of construction of the A5 roundabout as shown on the highway general arrangement plans (Document 2.9G).
The West Midlands Trunk Road (Prohibition of Waiting) (Clearways) Amendment Order 1989
1989 No. 1037
New side road Terminals Signs to be added to Highways Agency Drawing M91226005/DRA5E_01 at new junction with A5/A449 link road.
Upon the opening of the A5 roundabout to public traffic as shown on the highway general arrangement plans (Document 2.9G).
Prohibition of waiting on verges along the section of the A449 between points CC and DD as shown on the traffic regulation plans (Document 2.11A and 2.11D).
Upon the commencement of construction of the relocated A449 laybys as shown on the highway general arrangement plans (Document 2.9E).

---
Source: https://www.legislation.gov.uk/uksi/2020/511/schedule/9/part/1 (the official version)
Page: https://openlegislation.uk/west-midlands-rail-freight-interchange-order-2020/schedule-9/part-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

