# The West Midlands Rail Freight Interchange Order 2020, Part 2: CLEARWAYS


(1) Location
(2) Description
(3) Inclusion prohibition of waiting on verges?
(4) Event
A5/A449 link road
Shown coloured pink between points A and B on the traffic regulation plans (Documents 2.11A and 2.11B).
No
Upon the opening of the A5/A449 link road to public traffic as shown on the highway general arrangement plans (Documents 2.9C, 2.9D, 2.9H and 2.9G).
A5/A449 link road
Shown with a dashed green line between points C and D on the traffic regulation plans (Documents 2.11A and 2.11B).
Yes
Upon the opening of the A5/A449 link road to public traffic as shown on the highway general arrangement plans (Documents 2.9C, 2.9D, 2.9H and 2.9G).
A5/A449 link road roundabout with Vicarage Road link
Shown coloured green between points E and F on the traffic regulation plans (Documents 2.11A and 2.11B).
No
Upon the opening of the A5/A449 link road roundabout with Vicarage Road link to public traffic as shown on the highway general arrangement plans (Document 2.9H).
A5/A449 link road roundabout with Vicarage Road link
Shown dashed green at between points G and H on the traffic regulation plans (Documents 2.11A and 2.11B).
Yes
Upon the opening of the A5/A449 link road roundabout with Vicarage Road link to public traffic as shown on the highway general arrangement plans (Document 2.9H).
Vicarage Road Roundabout
Shown coloured orange at point I on the traffic regulation plans (Document 2.11B).
No
Upon the opening of the Vicarage Road roundabout to public traffic as shown on the highway general arrangement plans (Document 2.9I).
Vicarage Road Roundabout
Shown dashed green at point J on the traffic regulation plans (Document 2.11B).
Yes
Upon the opening of the Vicarage Road roundabout to public traffic as shown on the highway general arrangement plans (Document 2.9I).

---
Source: https://www.legislation.gov.uk/uksi/2020/511/schedule/9/part/2 (the official version)
Page: https://openlegislation.uk/west-midlands-rail-freight-interchange-order-2020/schedule-9/part-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

