# The West Midlands Rail Freight Interchange Order 2020, Part 3: NO WAITING AT ANY TIME


(1) Location
(2) Length
(3) Event
Station Drive turning head
Between points K, L and M as shown with a dark blue line on the traffic regulation plans (Document 2.11C).
Opening of the Station Drive turning head as shown on the highway general arrangement plans (Document 2.9A).
Bus stops on the A5/A449 link road
Between points N and O and P and Q shown with a dark blue line on the traffic regulation plans (Documents 2.11A and 2.11B).
Opening of the A5/A449 link road bus stops as shown on highway general arrangement plans (Documents 2.9D and 2.9H).
Bus stops on the A449
Between points R and S and T and U shown with a yellow line on the traffic regulation plans (Documents 2.11A and 2.11C).
Opening of the A449 roundabout as shown on the highway general arrangement plans (Document 2.9C).

---
Source: https://www.legislation.gov.uk/uksi/2020/511/schedule/9/part/3 (the official version)
Page: https://openlegislation.uk/west-midlands-rail-freight-interchange-order-2020/schedule-9/part-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

