Article 5 Water rights
(1)
During the construction of the works the Authority may take from the said River Bellart such water as they may require for such construction.
(2)
After completion of the works, the Authority may take from the River Bellart, in any day, a quantity of water not exceeding 300 cubic metres, as measured and recorded by an approved gauge (part of Works No 1), at a rate not exceeding 7 litres per second, except when the flow in the River Bellart, as measured by an approved gauge, is less than 100 litres per second, when the Authority may take water at a rate not exceeding 3.5 litres per second.