Schedule 1
The works referred to in this Order and shown on the deposited plan marked “The West of Scotland Water Authority (Dervaig-River Bellart) Water Order 1997 Plan of Catchment Area, Location Plan and Plans and Sections of Works No 1” are–
| Works No 1 | An intake structure incorporating pumps, intake and scour pipework, an approved gauge board and weir to measure the specified flow in the River Bellart and an approved gauge to measure and record the amount of water taken from the river and the rate at which the said amount was taken. |