# The West of Scotland Water Authority (Lochnaw) Ordinary Drought Order 2000, Schedule


The works referred to in this Order and shown marked on the deposited plan are:–
Work No. 1: Installing an intake and flow gauge.
Work No. 2: Laying of a pump and overland pipeline from grid reference NGR NW 993 629 in Lochnaw with a mid stage pump at grid reference NGR NX 010 617 to Dindinnie Reservoir at grid reference NGR NX 021 607.
Work No. 3: Installing a gauge to measure the level of the water in Lochnaw during the relevant period by reference to its level immediately before the Authority first takes water under this Order.

---
Source: https://www.legislation.gov.uk/ssi/2000/310/schedule (the official version)
Page: https://openlegislation.uk/west-of-scotland-water-authority-lochnaw-ordinary-drought-order-2000/schedule
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

