The undertaker must, as soon as practicable after the making of this Order, submit to the Secretary of State copies of—
(a) the book of reference (dated August 2020);
(b) the land plan (drawing number 9812-0071-02 dated July 2020);
(c) the work plan (drawing number 9812-0072-02 dated July 2020);
(d) the environmental statement (dated September 2019);
(e) the K3 Generating Station approved plans as follows:
(i) 16315-A1-P-0100 4.3D Proposed Site Layout Rev U dated November 2009;
(ii) 16315-A1-P-0110 4.4D South East Elevation Rev U dated November 2009;
(iii) 16315-A1-P-0111 4.5D North East Elevation Rev T dated November 2009;
(iv) 16315-A1-P-0112 4.6D South West Elevation Rev U dated November 2009;
(v) 16315-A1-P-0113 4.7D North West Elevation Rev T dated November 2009;
(vi) 16315-A1-4.21 Landscape Masterplan Rev M dated June 2013;
(f) the K3 rail and water transportation strategy (dated September 2019);
(g) the Design and Access Statement dated September 2019;
(h) the draft K3 operational traffic routing and management plan; and
(i) the draft K3 travel plan – Highways England version (dated 7 August 2020)
for certification that they are true copies of the documents referred to in this Order.
(2) A plan or document so certified shall be admissible in any proceedings as evidence of the contents of the document of which it is a copy.

---
Source: https://www.legislation.gov.uk/uksi/2021/173/article/16 (the official version)
Page: https://openlegislation.uk/wheelabrator-kemsley-k3-generating-station-order-2021/article-16
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.