Schedule 1 AUTHORISED DEVELOPMENT

Original text. Later amendments are not shown.

In the County of Kent a nationally significant infrastructure project as defined in sections 14(1)(a) and 15 of the 2008 Act and associated development within the meaning of s115(2) of the 2008 Act—

Work No. 1- An electricity generating station (the K3 Generating Station) with a gross installed generating capacity of up to 75MW and capacity to process up to 657,000 tonnes of waste per annum, comprising the following works—

(a)

tipping hall;

(b)

waste fuel bunker;

(c)

boiler hall;

(d)

flue gas treatment building;

(e)

turbine hall housing steam turbine and generator;

(f)

air cooled condenser;

(g)

stack and associated emissions monitoring system;

(h)

electricity substation;

(i)

stores and utilities;

(j)

administration office;

(k)

fire water tanks;

(l)

stores;

(m)

weighbridges, gatehouses, fuel tank, raw water tank, vehicle ramps, diesel generators.

Work No. 1A – Installation of grid connection for Work No 1.

Work No. 1B – Installation of steam connection for Work No 1.