Article 5 Power to deviate
In constructing the works authorised by article 3 the Commissioners may deviate laterally from the lines or situations thereof shown on the deposited plans to the extent of the limits of deviation and may deviate vertically from the levels of those works shown on the deposited sections to any extent not exceeding two metres upwards and to such extent downwards as may be found necessary or convenient.