In carrying out, maintaining or diverting the authorised development, the undertaker may—
(a) deviate Works No. 1, 2, 3(f), 3(k), 4, 5 and 6 laterally from the lines or situations of the authorised development shown on the works plans within the extent of the limits of deviation shown on those plans; and
(b) deviate Works No. 1 and 2 vertically—
(i) upwards to a limit of not less than 1.1 metres below the surface of the ground; and
(ii) to any extent downwards as may be found to be necessary or practical to a maximum depth of 70 metres below the surface of the ground,
except that sub-paragraph (i) does not apply to those parts of Works No. 1 and 2 that are built within the Yoxall AGI site, where such works may deviate upwards to a limit of 2.8 metres above ground level;
(c) deviate or place Works No. 3, 4, 5 and 6 vertically upwards or above ground level to the height limits set for each of these works in Part 1 of Schedule 1.

---
Source: https://www.legislation.gov.uk/uksi/2014/3328/article/7 (the official version)
Page: https://openlegislation.uk/willington-c-gas-pipeline-order-2014/article-7
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.